检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:成小飞 罗昱 翟必垚 王兴刚[3] 许条建 CHENG Xiaofei;LUO Yu;ZHAI Biyao;WANG Xinggang;XU Tiaojian(School of Civil and Ocean Engineering,Jiangsu Ocean University,Lianyungang 222003,China;School of Ocean Engineering,Jiangsu Ocean University,Lianyungang 222003,China;River and Harbour Engineering Department,Nanjing Hydraulic Research Institute,Nanjing 210029,China;Deep Sea Engineering Research Centre,Dalian University of Technology,Dalian 116024,China)
机构地区:[1]江苏海洋大学土木与港海工程学院,江苏连云港222003 [2]江苏海洋大学海洋工程学院,江苏连云港222003 [3]南京水利科学研究院河流海岸研究所,江苏南京210029 [4]大连理工大学深海工程研究中心,辽宁大连116024
出 处:《舰船科学技术》2024年第24期121-128,共8页Ship Science and Technology
基 金:辽宁省自然科学基金计划面上项目(2023-MS-112)。
摘 要:随着新一轮能源革命的进行,海上漂浮式光伏成为新能源发展的新战场。采用球形离散元法构建海上漂浮式薄膜光伏电站系统的数值模型,并在不同波高、周期和结构直径条件下进行水动力特性的数值计算。研究结果验证采用的数值方法分析海上漂浮式薄膜光伏电站系统水动力特性的适用性。结果表明,随着波高和结构直径增大,位移、波浪力和系泊力三者逐渐增大。随着周期增大,水平位移减小,垂直位移增大,水平波浪力先增大再减小,垂直波浪力在波高H=4.0 m和H=5.0 m时减小,在波高H=5.0 m和H=5.5 m时增大,迎浪侧系泊力先增大再减小,背浪侧系泊力先增大后减小再增大。在各种工况下,水平波浪力大于垂直波浪力,迎浪测系泊力大于背浪侧系泊力。With the new round of energy revolution,offshore FPV becomes a new battlefield for new energy development.A numerical model of the offshore thin film FPV system is constructed using the spherical discrete element method,and the numerical calculation of the hydrodynamic characteristics is carried out under the conditions of different wave heights,periods and structure diameters.The results validate the applicability of the numerical method for analysing the hydrodynamic characteristics of offshore thin film FPV systems.The results show that with the increase of wave height and structure diameter,the displacement,wave force and mooring force gradually increase;with the increase of period,the horizontal displacement decreases,the vertical displacement increases,the horizontal wave force increases and then decreases,the vertical wave force decreases at wave heights of H=4.0 m and H=5.0 m,and then increases at wave heights of H=5.0 m and H=5.5 m,and the mooring force at the facing side of the wave firstly increases and then decreases and that at the back of the wave firstly increases and then decreases and then decreases.In all working conditions,the horizontal wave force is greater than the vertical wave force,and the wave measurement mooring force is greater than the back wave side mooring force.
分 类 号:TM615[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.206.193