EMC预制空心叠合剪力墙施工技术研究与应用  

Research and Application of EMC Prefabricated Hollow Composite Shear Wall Construction Technology

在线阅读下载全文

作  者:刘旭辉 张铭剑 袁超 常子政 LIU Xuhui;ZHANG Mingjian;YUAN Chao;CHANG Zizheng(The Second Construction Limited Company of China Construction Eighth Engineering Division,Jinan Shandong 250014,China)

机构地区:[1]中建八局第二建设有限公司,山东济南250014

出  处:《工程质量》2024年第S02期91-95,共5页Construction Quality

摘  要:论文通过对原有预制叠合剪力墙连接方式进行改进,形成了EMC预制空心叠合剪力墙体系,该体系在墙体内部预埋波纹管,通过大直径钢筋套筒机械连接及分布钢筋间接搭接连接的方式,改变墙体内部及层间钢筋的连接形式,避免以往灌浆套筒连接施工工艺,有效加快施工进度;其次,EMC预制空心叠合剪力墙体系在波纹管内仅设单根钢筋,构件吊装对位方便,施工效率和施工质量大幅高。This paper improves the connection method of the prefabricated composite shear wall by forming the EMC prefabricated hollow composite shear wall system.The system pre-installs corrugated pipes in the wall body and connects the steel bars through large diameter threaded steel bar connectors and distributed steel bars indirectly.This changes the connection form of the steel bars within and between layers,avoiding the previous grouted tube connection construction process and effectively accelerating the construction progress.Secondly,the EMC prefabricated hollow composite shear wall system only has one steel bar in the corrugated pipe,making it convenient to position the components during hoisting,greatly improving the construction efficiency and quality.

关 键 词:EMC 预制叠合剪力墙 大直径钢筋 波纹管 

分 类 号:TU745[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象