混凝土全预制抽芯楼板-梁节点静力试验研究  

Static Test Study of Concrete Fully Precast Core-Pulling Floor-Beam Joint

在线阅读下载全文

作  者:于洪平 李新华 赵辉 龚祖平 黄佳华 YU Hong-ping;LI Xin-hua;ZHAO Hui;GONG Zu-ping;HUANG Jia-hua(Shanghai Zhongsen Architecture and Engineering Design Consulting Co.Ltd.,Shanghai 200026,China;Nantong Lianlong Prefabricated Building Technology Co.Ltd.,Nantong 226000,China)

机构地区:[1]上海中森建筑与工程设计顾问有限公司,上海200026 [2]南通联泷装配式建筑科技有限公司,江苏南通226000

出  处:《工程建设与设计》2024年第24期11-13,共3页Construction & Design for Engineering

摘  要:结合全预制空心楼板与密拼叠合楼板的优势,提出一种全预制抽芯楼板,为研究此全预制楼板与结构梁连接节点在平面外静力荷载下的破坏形态、受弯性能,设计了1个全预制试件,并与1个现浇节点进行对比。通过对试件静力加载所得荷载-位移曲线及板内应力变化进行分析,表明预制节点承载力高于整体现浇节点,预制节点表现出受弯破坏,未发生叠合面的剪切破坏。Based on the advantages of the precast hollow floor and the close composite floor,a precast core-drawing floor is proposed.In order to study the failure mode and bending behavior of the joint connecting the precast floor and the structural beam under static load,a precast specimen is designed and compared with a cast-in-place joint.By analyzing the load-displacement curve and the stress variation of the specimens under static loading,it is shown that the bearing capacity of the prefabricated joints is higher than that of the cast-in-place joints,and the prefabricated joints show bending failure without shear failure of the superposed surfaces.

关 键 词:全预制 装配式楼板 楼板-梁节点 静力试验 

分 类 号:TU312.3[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象