检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘康[1] 王勇 曲殿英 汪宇雄 杨华俊 付凯明 LIU Kang;WANG Yong;QU Dian-ying;WANG Yu-xiong;YANG Hua-jun;FU Kai-ming(China Construction Second Engineering Bureau Co.Ltd.,Beijing 100160,China;China Nuclear Power Engineering Co.Ltd.,Shenzhen 518000,China)
机构地区:[1]中国建筑第二工程局有限公司,北京100160 [2]中广核工程有限公司,广东深圳518000
出 处:《工程建设与设计》2024年第24期20-23,共4页Construction & Design for Engineering
摘 要:通过对工况特征及施工难点进行分析,提出一种适应三代核电大吨位预应力系统张拉的平台小车布置方案,并以某三代核电项目为载体进行实际应用,对其设计、使用过程及效果进行验证总结。Based on the analysis of the working condition characteristics and construction difficulties,a layout scheme of platform trolley adapted to the tension of the third-generation nuclear power large-tonnage prestressing system is proposed,and a third-generation nuclear power project is used as the carrier for practical application,and its design,use process and effect are verified and summarized.
分 类 号:TU757[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7