作 者:施磊 SHI Lei(Shanghai Investigation,Design&Research Institute Co.Ltd.,Shanghai 200335,China)
机构地区:[1]上海勘测设计研究院有限公司,上海200335
出 处:《工程建设与设计》2024年第24期45-47,共3页Construction & Design for Engineering
摘 要:首先,以乌兰察布某项目为研究案例,对比分析了单回输送25 MW方案和单回输送50 MW方案的线路长度及工程造价;其次,以安徽阜南某项目为研究案例,对比分析了单回输送25 MW方案和集中连片送出方案的路径长度和工程造价。结果表明,通过采用双分裂导线使集电线路单通道输送容量达到100 MW,实现集电线路单通道倍容能力,可在节约线路走廊、减少征地、节省投资等方面取得可观效益。This paper takes Ulanqab project as a case study,and compares and analyzes the line length and engineering cost of 25 MW single loop transmission scheme and 50 MW single loop transmission scheme.Secondly,taking Funan project in Anhui Province as a case study,the path length and project cost of single return transmission 25 MW scheme and centralized continuous delivery scheme are compared and analyzed.The results show that the transmission capacity of single channel of the collector line can reach 100 MW by using double split wires,and the capacity of single channel of the collector line can be achieved,which can achieve considerable benefits in saving corridor,reducing land acquisition and saving investment.
关 键 词:大规模陆上风电场项目 集电线路 双分裂导线 输送容量
分 类 号:TM751[电气工程—电力系统及自动化] TM614
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.251.232