摘 要:近年来,建筑行业整体下行压力加大,建筑工程纠纷问题不断增加。建设工程具有施工周期长、涉及单位多、工艺交错繁复、施工工序多等特点,一旦涉及合同争议,必会涉及建设项目各参建方的利益诉求,导致企业出现涉诉(仲裁)案件上升而产生被动应诉的局面。论文从工程经济与法律实务出发,结合建设工程造价鉴定技术,对建设工程合同纠纷的应对途径等方面进行分析与探讨并给出建议。In recent years,the overall downward pressure on the construction industry is increasing,and construction project disputes are increasing.Construction projects have the characteristics of long construction period,many units involved,complicated technology,and multiple construction procedures.Once contract disputes are involved,it will involve the interests of the construction project participants,resulting in a situation of passive response to the rise of litigation(arbitration)cases.Based on engineering economics and legal practice,combined with appraisal technology of construction project cost,this paper analyzes and discusses the ways to deal with construction contract disputes,and gives some suggestions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.248