检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈立研 成虎[2] 王东升 王荣霞 Chen Li-yan;Cheng Hu;Wang Dong-sheng;Wang Rong-xia(School of Civil Engineering and Transportation,Hebei University of Technology,Tianjin 300401,China;School of Environment and Civil Engineering,Jiangnan University,Wuxi 214122,China)
机构地区:[1]河北工业大学土木与交通学院,天津300401 [2]江南大学环境与土木工程学院,江苏无锡214122
出 处:《工程抗震与加固改造》2024年第6期52-64,共13页Earthquake Resistant Engineering and Retrofitting
基 金:国家自然科学基金(52008186);江苏省自然科学基金(BK20200605)。
摘 要:强震下多跨连续梁桥可能会发生邻梁碰撞,导致伸缩缝以及过渡墩的破坏,甚至出现落梁问题。针对传统减震装置的局限性,本文提出了一种高阻尼隔震橡胶支座与不锈钢U型阻尼器联合使用的组合减震体系,在耗能的同时有效控制梁体位移。以强震区临近断层的一座预应力混凝土连续梁桥为工程案例,采用有限元软件Midas Civil建立了空间动力分析模型,通过输入不同的近断层地震动进行非线性动力时程分析,对比研究了桥梁采用不同减震体系时的地震响应。结果表明:仅采用高阻尼隔震橡胶支座的桥梁在近断层地震作用下支座变形过大,桥梁有落梁风险;当增设不锈钢U型阻尼器后,可有效控制墩梁间的相对位移以及过渡墩的地震响应,各工况下减震率均在70%以上,减震效果显著。Under strong earthquakes,the adjacent beams of multi-span continuous girder bridges may collide,resulting in the damage of expansion joints and transition piers,and even the beam falling problem.In view of the limitations of the traditional damping device,this paper proposes a combined damping system of high damping isolation rubber bearing and stainless steel U-shaped damper,which can effectively control the displacement of the beam while consuming energy.Taking a prestressed concrete continuous beam bridge near the fault in the strong earthquake area as an engineering case,the finite element software Midas Civil was used to establish the spatial dynamic analysis model.The nonlinear dynamic time history analysis was carried out by inputting different near-fault ground motions,and the seismic responses of the bridge with different damping systems were compared and studied.The results show that the bearing deformation of the bridge with high damping isolation rubber bearings is too large under near-fault earthquake,and the bridge has the risk of falling beam.When the stainless steel U-shaped damper is added,the relative displacement between the pier and beam and the seismic response of the transition pier can be effectively controlled.The damping rate under each working condition is more than 70%,and the damping effect is remarkable.
关 键 词:连续梁桥 不锈钢U型阻尼器 近断层地震动 组合减震系统
分 类 号:U442.55[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.177.138