作 者:刘新安[1] 高荣宁[1] 王社平[1,2] 尹博涵 冯云刚 翟旭娜[1] LIU Xin'an;GAO Rongning;WANG Sheping;YIN Bohan;FENG Yungang;ZHAI Xuna(Xi'an Municipal Engineering Design&Research Institute Co.Ltd,Xi'an 710068,China;School of Environmental and Municipal Engineering,Xi'an University of Architectural and Technology,Xi'an 710055,China;Beijing General Municipal Engineering Design&Research Institute Co.Ltd,Beijing 100082,China)
机构地区:[1]西安市政设计研究院有限公司,西安710068 [2]西安建筑科技大学环境与市政工程学院,西安710055 [3]北京市市政工程设计研究总院有限公司,北京100082
出 处:《水科学与工程技术》2024年第6期44-46,共3页Water Sciences and Engineering Technology
摘 要:地上式污水处理厂生化反应池加设混凝土顶盖设计是一项系统性工作,合理的顶盖设计是后期安全、便捷运行及景观效果良好的基础。以西安市鱼化污水处理厂生化反应池混凝土顶盖设计为例,探讨顶盖巡检通道设置、主要设备及管路布置、覆土绿化等方面设计时需考虑的关键内容。实际运行效果表明,通过合理利用顶盖空间设置主次巡检通道、布置设备、管路及增加覆土绿化,创造了便利的巡检、维护条件,可取得良好的工程绿化及密封除臭效果,可为供类似污水处理项目参考借鉴。The design of adding concrete roof to the wide biochemical reaction tank of the above-ground sewage treatment plant is a systematic work.A reasonable cover design is the foundation for safety,convenient operation and good landscape effects.Based on the design case of concrete top slabs of biochemical reaction tank of Yuhua sewage treatment plant in Xi'an,author discussed the key factors that need to consider in the design,such as inspection channel setting,main equipment and pipe setting and greening.The actual operation effect shows that the convenient inspection and maintain condition,a good landscape and better effect of deodorization can be created by using the top slabs space reasonably.By this way,we set the primary and secondary inspection channel,piping,and increase the greening area.The design case mentioned can be used for the similar sewage treatment project as a reference.
关 键 词:生化反应池 混凝土顶盖 巡检通道 管路布置 覆土绿化
分 类 号:X703[环境科学与工程—环境工程]