作 者:樊轩 梁皓奕 郭志勇 FAN Xuan;LIANG Haoyi;GUO Zhiyong(China Energy Engineering Group Northwest China Electric Pozwer Test Research Institute Co.,Ltd.,Xi'an 710054,China)
机构地区:[1]中国能源建设集团西北电力试验研究院有限公司,西安710054
出 处:《给水排水》2024年第12期75-78,共4页Water & Wastewater Engineering
摘 要:湖北某新建火电厂水源采用江河水,原水预处理系统采用高密度沉淀池处理工艺,在调试初期遇到了达不到设计出力、跑矾花,以及产水水质差、易翻池等问题,严重影响原水预处理系统按时投产.现场采取局部改造,以及调整试验等措施后,顺利完成工程调试,达到了设计指标.The water source of a newly-built thermal power plant in Hubei province adopts riv-er water,and the raw water pretreatment system adopts high-density sedimentation tank treatment technology.In the initial stage of commissioning,some problems were encountered,such as una-ble to reach the designed output,running alum flowers,poor water quality,easy to turn over the pool and so on.The above problems seriously affected the commissioning time of the raw water pretreatment system.After taking measures such as partial transformation and adjustment test,the commissioning of the system was completed successfully,and the design index was reached.
分 类 号:TM621.8[电气工程—电力系统及自动化] X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15