基于泵后球阀调节的泵站输水系统水锤防护研究  

Research on water hammer protection of water conveyancesystem of pumping station based on valve adjustment of pump back

在线阅读下载全文

作  者:王建斌 Wang Jianbing(Gansu Branch of Hohai University Design and Research Institute Co.,Ltd.,Lanzhou 730010,China)

机构地区:[1]河海大学设计研究院有限公司甘肃分公司,甘肃兰州730010

出  处:《吉林水利》2025年第1期13-16,31,共5页Jilin Water Resources

摘  要:输水工程作为缓解国内水资源时空分配不均的重要举措,其运行安全日渐成为研究重点。以西部地区某市输水工程为研究对象,利用水锤基本理论与数值模拟相结合的方法,对设置空气罐防护的高扬程输水系统水泵掉电造成的泵后管道超压、应用泵后球阀调节的有效性进行研究。结果表明,采用合理的操作方式对泵后球阀进行开关,可有效解决输水管道超压问题,减小工程所需的空气罐体积,降低建设成本。As an important measure to alleviate the uneven spatial and temporal distribution of domestic water resources,the operation safety of water delivery projects become the focus of research.This study takes a water delivery project in a city in the western region as the research object.By combining the basic theory of water hammer with numerical simulation,the overpressure of the pipeline after the pump caused by the power failure of the water pump in the high-lift water delivery system with air tank protection and the effectiveness of the adjustment of the ball valve after the pump are studied.The results show that the reasonable operation method of opening and closing the ball valve after the pump can effectively solve the overpressure problem of the water delivery pipeline,reduce the volume of the air tank required for the project,and reduce the construction cost.

关 键 词:水锤防护 输水工程 空气罐 

分 类 号:TV675[水利工程—水利水电工程] TV134

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象