INNOVATIVE LOW ENERGY RENOVATION OF AN OFFICE BUILDING:CONCEPT AND SIMULATION  

在线阅读下载全文

作  者:Friedrich Sick Alfred Kerschberger 

机构地区:[1]Professor for Renewable Energies at FHTW Berlin University of Applied Sciences [2]不详

出  处:《Journal of Green Building》2007年第2期31-41,共11页绿色建筑学报(英文)

摘  要:INTRODUCTION Energy considerations are often neglected when it comes to refurbishments in office buildings erected in Germany during the first postwar decades.With a primary energy consumption ranging from 200 to 300 kWh/(m^(2)a),*it is worthwhile thinking about lowering the operating costs for these buildings using ambitious design concepts for their capacity to lower building energy consumption.The German Federal Ministry for Economic Affairs tries to encourage model refurbishments in a funding program called ENOB–ENergy Optimized Building.Within this program,an interdisciplinary planning team developed a concept ready for realization for the office building of the DEGEWO company,located in Berlin(see Figure 1)[1].

关 键 词:OFFICE FIGURE REALIZATION 

分 类 号:TP3[自动化与计算机技术—计算机科学与技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象