检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王道席[1] 胡和平[1] 陈红莉[2] 杨立彬[2] 王煜[2]
机构地区:[1]清华大学水利系,北京100084 [2]黄河水利委员会勘测规划设计研究院,河南郑州450003
出 处:《水文》2002年第6期25-28,共4页Journal of China Hydrology
基 金:国重点基础研究发展规划(973)资助项目(G19990436)
摘 要:借助于“黄河流域水资源模拟模型”,采用长系列模拟方法计算了龙羊峡水库兼顾中下游供水的效益。初步研究表明,龙羊峡水库可以在一定程度上兼顾中下游用水,特别是在枯水年能够有效减少干流缺水,虽然这是以上游梯级发电效益减少为代价,但代价甚微。As the only reservoir of overyear regulation in the Yellow River,Longyangxia Reservoir can take important roles in the unit water operation of the river.The operation of Longyangxia Reservoir,which considering water supply for the lower reaches means its water supply area is enlarged.In this case,what is the influence on the power generation of upper cascade power stations?How much is the water supply capacity added?All these are the focus questions considered by water and power departments.Based on'Yellow River Water Resources Simulation Model',this paper uses long series simulation method to calculate the benefits of the operation of Longyangxia Reservoir considering water supply for the lower reaches.The study indicates that Longyangxia Reservoir operation can consider the water supply for the lower reaches.In the dry years,it can reduce water shortage of the trunk steam as affe cted at the expensive of the fall of power.However the expensive is little.
分 类 号:TV697.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229