检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑文忠[1] 解恒燕[1] 郑弦[1] 潘景龙[1]
出 处:《建筑结构》2002年第11期14-15,19,共3页Building Structure
摘 要:介绍了大兴安岭森林防火指挥部两种抽柱改造方案的设计思想及有关构造做法 ,分析了两种方案在结构性能、施工难易程度、施工工作量、质量保证等方面的特点 ,指出了在选定方案后施工过程中应注意的问题 。Reconstruction project of demolishing columns is one of the main means of reconstructing building function.The design idea and relevant constructions of two reconstruction schemes of Daxinganling Forest Fire Protection Headquarters with demolishing columns are introduced,and characteristic of the schemes in structural performance,various degrees of construction difficulty,amount of work and quality of construction etc,are analyzed too.The problems at construction process are pointed out after making choice from the schemes,which will be referred to the design of similar reconstruction project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15