丹江口大坝加高工程水力学试验研究  

Hydraulics study on heightened scheme of Danjiangkou Project

在线阅读下载全文

作  者:王才欢[1] 陈忠儒[1] 毛新仪 

机构地区:[1]长江科学院水工研究所,湖北武汉430010

出  处:《长江科学院院报》2002年第B09期14-17,共4页Journal of Changjiang River Scientific Research Institute

摘  要:介绍了丹江口大坝加高后的水力学模型研究成果,含枢纽泄流能力、溢流坝面及门槽边壁压力特性以及坝下河床冲刷等,并与大坝加高前已运行30余年的原型观测资料进行了对比,分析了其合理性和可靠性,对存在的问题亦提出了改进措施。This paper introduces the hydraulics test results on the heightened scheme of Danjiangkou Dam, including discharge capacity,pressure characteristics of the spillway surface and in gate slots region, scouring situation of the riverbed downstream dam, etc.. By comparing the test results with prototype observation data from the existing dam, which has run for over thirty years, their rationality and reliability are analyzed, and the improvement measures for solving existing problems were proposed.

关 键 词:水力学 试验 大坝 加高 泄流能力 时均压力 基岩冲刷 丹江口水利枢纽 

分 类 号:TV135[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象