检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江科学院,湖北武汉430010
出 处:《长江科学院院报》2002年第B09期29-31,35,共4页Journal of Changjiang River Scientific Research Institute
摘 要:介绍了南水北调中线工程冰期输水采用数学模型计算取得的初步成果。其参数以与南水北调中线工程条件类似的渠道或河道冰水力学的原型观测及资料分析确定。计算结果表明:南水北调中线工程在鹤壁以北具有水内冰的生成条件,愈向北水内冰含冰量愈大;在计算条件下不致影响冰期输水量;由于总干渠冰期流速较大,不可能结成冰盖;建筑物及边坡冻胀问题应予以重视。The problems of water transfer in ice period for the Middle Line of Water Transfer Project from Southto Noth China are briefly presented. The preliminary results were obtaind by a mathematic model, in which hydraulic parameters were determined using the data obtained from similar channels with the Water Transfer Project from South to Noth or from prototype observation information of river ice?hydraulics. The calculation results showed that there exists the conditions for ice formation in water at north of Hebi where the Water Transfer Project from South to North will pass through, and the more north of Hebi, the more ice?content in water; the water delivery demand will be not affected in ice period under the calculation conditions; ice cover would be not formed due to relatively high velocities in channel; but much attention should be paid to frozen heave problems on structures and channel slopes.
分 类 号:TV68[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.136.129