天桥水力发电厂除险扩泄及增容方案  

Scheme of Enlarging Flood Discharging Capacity and Increasing Water Adjusting Volume Prepared by Tianqiao Hydroelectric Water Power Plant

在线阅读下载全文

作  者:周满生[1] 张定华[1] 刘守中 张向东 

机构地区:[1]天桥水电厂,山西天桥036602 [2]山西地方电力公司,山西太原030001

出  处:《山西电力》2002年第A02期19-22,共4页Shanxi Electric Power

摘  要:叙述了天桥水电厂基建及生产经营情况 ,对天桥电厂险坝的由来以及投产以来编制过的除险及扩泄增容方案作了简要介绍。并对计划经济时期建成的水力发电厂 ,在生产经营、更新改造、扩建除险以及可持续发展方面作了探讨。It gives a brief introduction of the basic construction and production operational conaitions of Tianqiao Water Power Plant,origin of Tiaoqiao Power Plant's dangerous dam and all the schemes about enlarging flood discharging capacity and increasing water adjusting volume prepared since the plant was built during planning.As for the hydroelectric power plants that were built during planning economic period,It also makes discussion from some aspects as production operation,renovation and reconstruction,risk elimination and sustainable development etc.for reference.

关 键 词:天桥水力发电厂 大坝定检 除险加固 扩泄增容 经济指标分析 水轮发电机组 

分 类 号:TV72[水利工程—水利水电工程] TM312[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象