坝基土渗透稳定分析与对策研究  

Seepage Stability Analysis of Dam Foundation and Study of Countermeasures

在线阅读下载全文

作  者:程润虎[1] 张许平[1] 韩王平[1] 李葆华[1] 

机构地区:[1]水利部山西水利水电勘测设计研究院,山西太原030024

出  处:《山西电力》2002年第A02期25-27,共3页Shanxi Electric Power

摘  要:坝基中存在松散覆盖是产生渗漏的首要条件 ,渗漏量过大 ,直接影响工程效益 ,且因渗漏力的长期作用下 ,将产生颗粒位移管涌破坏。为此防渗处理方案选择是十分必要的。通过对横泉水库坝基渗漏稳定分析 ,进行了合理防渗处理方案比较 。Loose overburden existed in dam foundation is the primary condition for the china appearence of seepage.If the seepage condition is worse,it will directly influence the project benefit.And also,with the long-term effect of seepageforce,piping damage such as grain displacement will happen.Therefore,the selection of seepage trestment scheme is quite necessary.Through the seepage stability analysis of Hengquan reservoir dam foundation,this paper makes a reasonable comparison of seepage treatment schemes,which is beneficial to the contruction of project and development.

关 键 词:坝基 土渗透 稳定分析 对策 防渗帷幕 塑性砼防渗墙 水库 

分 类 号:TV698.12[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象