检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程润虎[1] 张许平[1] 韩王平[1] 李葆华[1]
机构地区:[1]水利部山西水利水电勘测设计研究院,山西太原030024
出 处:《山西电力》2002年第A02期25-27,共3页Shanxi Electric Power
摘 要:坝基中存在松散覆盖是产生渗漏的首要条件 ,渗漏量过大 ,直接影响工程效益 ,且因渗漏力的长期作用下 ,将产生颗粒位移管涌破坏。为此防渗处理方案选择是十分必要的。通过对横泉水库坝基渗漏稳定分析 ,进行了合理防渗处理方案比较 。Loose overburden existed in dam foundation is the primary condition for the china appearence of seepage.If the seepage condition is worse,it will directly influence the project benefit.And also,with the long-term effect of seepageforce,piping damage such as grain displacement will happen.Therefore,the selection of seepage trestment scheme is quite necessary.Through the seepage stability analysis of Hengquan reservoir dam foundation,this paper makes a reasonable comparison of seepage treatment schemes,which is beneficial to the contruction of project and development.
关 键 词:坝基 土渗透 稳定分析 对策 防渗帷幕 塑性砼防渗墙 水库
分 类 号:TV698.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175