检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:党福江[1]
出 处:《水土保持研究》2002年第4期36-37,共2页Research of Soil and Water Conservation
摘 要:在沟壑治理工程布置过程中 ,存在着单纯拦截、贮蓄的现象 ,缺乏完全理论研究与指导。甚至水土保持技术文件也存在片面性 ,导致基层实施单位“年年筑坝年年垮、数量升级无实存”。根据伯努里能量守恒定律 ,工程布设应分为抬高侵蚀基点 Z2 与降低侵蚀源点 Z1 两种途径。为此引进跌水坝概念。提出在沟壑治理中 ,不可片面强调“抬或降”,应将抬高侵蚀基点与降低侵蚀源点有机配合 ,科学地将沟道分割成若干的水力平衡断面 ,上有跌水坝控制下切护床底 ,下有谷坊坝拦蓄水土可造田。这样 。There is a lack of theoretical research and guidance and a phenomenon of simply retaining water in gully control engineering distribution, and even one sidedness in technical documents of soil and water conservation. These led to collapse in dam every year. According to the Bonuli law of conservation of energy, there are two ways to the engineering distribution,that is,to raise the erosion base point Z 2 and to lower the erosion source point Z 1,therefore,the concept of drop dam was introduced. In gully control engineering works, some measures should be adopted at the same time, such as combining the raise of erosion base point and there is the lower of erosion source point,scientifically dividing the gully into a certain number of hydraulically equilibrium section,and there is the drop dam in upper reaches to control and protect gully,and check dam in lower reaches to retain soil and water to make farmland.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28