检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北电力大学电力工程系,河北保定071003 [2]神头第二发电厂,山西朔州038500
出 处:《华北电力大学学报(自然科学版)》2003年第1期1-4,共4页Journal of North China Electric Power University:Natural Science Edition
摘 要:提出了计算电力系统非全相振荡时最大断口电势的简便方法。考虑到电网接线的影响,综合利用发电机分群原理及二端口混合参数方程,推导出与分群结果无关的一种新的断口电势计算公式。对复杂环网非全相振荡时最大断口电势计算的算例表明,该方法有效且满足实际电网整定计算的要求。A simple method for calculating maximum open-circuit potential was presented when power system was in the non-full phases and swings operation. Based on grouping theorem for generators and hybrid equation of two-port, the procedure to calculate open-circuit potential considering electric network structure was deduced, which is independent of the result of grouping generators. It meets the requirements of relay setting through a calculated example in complex ring net.
关 键 词:电力系统 非全相振荡 最大断口电势 计算 整定计算 暂态稳定 电网 继电保护
分 类 号:TM712[电气工程—电力系统及自动化] TM77
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.136.19.165