检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《桥梁建设》2002年第6期46-49,57,共5页Bridge Construction
摘 要:以厦门同安银湖独塔单索面单排索预应力混凝土部分斜拉桥的施工过程为对象 ,建立了以主梁线形控制为主同时兼顾斜拉索索力、主梁应力的监控体系 ,通过监控体系的实施 ,该桥已于 2 0 0 2年 7月 8日实现了高精度合龙 。During the construction of Xiamen Tongan Yinhu single pylon single cable plane single row prestressed concrete extroadosed cable stayed bridge, a control and monitor system mainly for the purpose of geometric control of main girder, and also of consideration of stay cable force, main girder stress was established. With this control and monitor system, accurate closure between the bridge spans was successfully made on July 8, 2002 and satisfactory construction control results were achieved therefrom.
关 键 词:施工控制 监控体系 独塔单索面单排索 预应力混凝土 斜拉桥
分 类 号:U448.27[建筑科学—桥梁与隧道工程] U445[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.46