检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵鹏 叶振东 马伟斌 颜明冬 张笑晨 ZHAO Peng;YE Zhendong;MA Weibin;YAN Mingdong;ZHANG Xiaochen(Railway Engineering Research Institute,China Academy of Railway Sciences Corporation Limited,Beijing 100081,China;State Key Laboratory of High-speed Railway Track System,Beijing 100081,China;China Railway Chengdu Group Co.,Ltd.,Chengdu 610000,Sichuan,China;China Railway Taiyuan Group Co.,Ltd.,Taiyuan 030000,Shanxi,China)
机构地区:[1]中国铁道科学研究院集团有限公司铁道建筑研究所,北京100081 [2]高速铁路轨道系统全国重点实验室,北京100081 [3]中国铁路成都局集团有限公司,四川成都610000 [4]中国铁路太原局集团有限公司,山西太原030000
出 处:《隧道建设(中英文)》2024年第12期2521-2529,共9页Tunnel Construction
基 金:“十四五”国家重点研发计划(2022YFB2603300)。
摘 要:为实现隧道基底结构在不中断运营的前提下拆换整治,提出一种结构灵活、施工便捷、适应铁路运营特点的隧道基底结构钢垫梁托换整治技术。首先,对基底托换技术的原理、工艺与钢垫梁结构形式进行分析;然后,通过钢垫梁结构足尺加载试验与数值仿真,分析钢垫梁在C80与CRH3列车活载下的承载特性;最后,研究得出跨度与横梁间距对钢垫梁变形特性的影响规律,即纵梁应力与跨中竖向变形随纵梁长度增加而增大,钢垫梁中间横梁的位置对横向变形影响大于竖向位移。结合托换整治技术在重载铁路和高速铁路隧道工程应用案例可知,列车通过时钢垫梁的变形与动力响应处于可控范围,托换整治后隧道基底结构变形稳定,表明钢垫梁能较好适用于铁路隧道基底结构托换整治。A flexible and easy-to-construct steel cushion beam underpinning technology is proposed to dismantle and remedy tunnel subgrade structure issues while keeping railway tunnels operational.The principle,process,and structural form of the steel cushion beam are introduced.The load-bearing characteristics of the steel cushion beams under the live loads of trains C80 and CRH3 are analyzed using full-scale loading tests and numerical simulations of the steel cushion beam structure.In addition,the effects of span and beam spacing on the deformation characteristics of the steel cushion beams are investigated.It is found that the longitudinal beam stress and middle crossbeam deformation increase with the length of the longitudinal beam.Furthermore,the position of the middle crossbeam has a greater influence on lateral displacement compared to vertical displacement.Application cases in heavy-haul and high-speed railway tunnels reveal that the deformation and dynamic response of the steel cushion beam are controllable during train operations.After the underpinning remediation,the deformation of the tunnel subgrade structure remains stable.These results indicate that the steel cushion beam is suitable for underpinning and remediating railway tunnel subgrade structures.
关 键 词:铁路隧道 基底病害 结构托换 钢垫梁 模型试验 数值仿真
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15