成都19号线正兴湾站建筑方案设计  

Architectural design proposal for Chengdu Metro Line 19 Zhengxingwan Station

作  者:叶新 Ye Xin(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu Sichuan 610031,China)

机构地区:[1]中铁二院工程集团有限责任公司,四川成都610031

出  处:《山西建筑》2025年第4期36-39,共4页Shanxi Architecture

基  金:中铁二院引导项目:地铁站换乘客流组织及空间布置关键技术研究(项目编号:KDNQ213017)。

摘  要:对成都轨道交通19号线二期正兴湾站建筑设计方案进行了分析,从行车组织越行功能、周边控制性因素、公共区及预留物业空间布置、附属优化压缩规模等方面进行了论述。结合工程实际案例,提出了配线区物业空间的预留设计思路,总结了车站附属顶出的设计要点,结合公共区大跨度开间空间条件营造出水波灵动的公共区装修视觉效果,可供后续地铁车站设计参考。The architectural proposal of Chengdu Metro Line 19 Zhengxingwan Station was analyzed,discussing aspects such as the bypass function in train operation,surrounding controlling factors,layout of public areas and reserved property spaces,and optimization of auxiliary facilities for scale compression.Combining actual project cases,the design concept for reserving property spaces in the auxiliary track area was proposed,along with key points for the station’s outbuilding.Additionally,leveraging the large-span,open public area,a visually dynamic water wave effect was created for the public area’s interior decoration,providing a reference for future subway station designs.

关 键 词:越行功能 地铁物业 无障碍设计 地下空间 

分 类 号:TU248.2[建筑科学—建筑设计及理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象