检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:肖志强 Xiao Zhiqiang(Jiangsu CRRC Urban Development Co.,Ltd.,Wuxi Jiangsu 214000,China)
机构地区:[1]江苏中车城市发展有限公司,江苏无锡214000
出 处:《山西建筑》2025年第4期100-104,共5页Shanxi Architecture
摘 要:在装配叠合整体式地下车站主体结构施工过程中,为了达到拼装结构严丝合缝、结构美观、减少结构渗漏、提升装配叠合整体式地下车站施工质量的目的,通过对拼装过程中关键工序的分析研究,制定了提高混凝土构件预制精度、测量精度、安装精度及预埋构件定位精度的相关控制措施,并在实践中进行应用,取得了良好效果,起到进一步推动地下装配叠合式结构发展的作用。In the construction process of the main structure of the assembled and stacked integrated underground station,in order to achieve a tight fit,beautiful structure,reduce structural leakage,and improve the construction quality of the assembled and stacked integrated underground station.Through the analysis and research of key processes in the assembly process,relevant control measures have been developed to improve the prefabrication accuracy,measurement accuracy,installation accuracy,and embedded component positioning accuracy of concrete components.These measures have been applied in practice and have achieved good results,further promoting the development of underground assembly composite structures.
分 类 号:TU721.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171