作 者:莫文博 Wenbo Mo(Department of Engineering Management,School of Transportation Engineering,Changsha University of Science and Technology,Changsha,Hunan,314000,China)
机构地区:[1]长沙理工大学交通运输工程学院工程管理系,湖南长沙314000
出 处:《工程设计与施工》2024年第11期13-15,共3页Engineering Design and Construction
摘 要:随着全球气候变暖和城市化进程的加快,高温天气在许多地区愈发常见,这对高层建筑电气施工的安全及质量控制带来了严峻挑战。高温环境下高层建筑的电气施工存在设备易老化,散热比较困难,现场施工人员易中暑,电气设备材料易发生火灾等隐患。论文旨在探讨高温环境下高层建筑电气施工的安全问题及质量控制措施,以确保高层建筑电气施工在高温环境下的顺利进行,同时确保施工人员的安全施工和建筑物电气设备的品质和使用功能。With the acceleration of global warming and urbanization,high temperature weather is becoming more and more common in many areas,which brings serious challenges to the safety and quality control of high-rise building electrical construction.The electrical construction of high-rise buildings in high temperature environment has hidden dangers such as easy aging of equipment,difficult heat dissipation,heat stroke of site construction personnel,and fire of electrical equipment materials.This paper aims to discuss the safety problems and quality control measures of electrical construction of high-rise buildings under high temperature environment,so as to ensure the smooth progress of electrical construction of high-rise buildings under high temperature environment,and ensure the safety of construction personnel and the quality and use function of electrical equipment of buildings.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117