高速铁路线路拨道换板技术研究  

Research on Rail Shifting Technology for Line Maintenance of HSR

在线阅读下载全文

作  者:张宝文 谢浩然 童发明 李世元[2] 张立鹏 徐凌雁 曾晓辉 刘超 ZHANG Baowen;XIE Haoran;TONG Faming;LI Shiyuan;ZHANG Lipeng;XU Lingyan;ZENG Xiaohui;LIU Chao(China Railway Design Corporation,Tianjin 300308,China;Southwest Jiaotong University,Chengdu,Sichuan 610031,China)

机构地区:[1]中国铁路设计集团有限公司,天津300308 [2]西南交通大学,成都610031

出  处:《铁道工程学报》2024年第12期53-59,共7页Journal of Railway Engineering Society

基  金:国家自然科学基金面上资助项目(52278470);中国国家铁路集团有限公司科技开发课题(K2022G001);中国铁路设计集团有限公司科技开发课题(2022A02238001)。

摘  要:研究目的:近年来无砟轨道板大修需求增加,营业线无砟轨道板更换正在成为全路的共性问题,寻求线路合理拨道换板作业参数以提升混凝土板更换效率有其必要性。为探讨优化高速铁路线路拨道换板合理作业参数,进一步提升工务换板养维效率,以既有运营线拨道整修换板作业为研究对象,建立线路拨道有限元模型,研究垫轨、拨轨状态下线路曲线超高条件、工装布置间距、扣件松开长度、温差等因素对拨道作业的影响。研究结论:(1)曲线超高地段作业条件更为严苛,拨道前分析调整各钢垫梁工装及轨距拉杆至合理布置间距可大幅提高作业安全性;(2)扣件上拔力受工装垫轨高度、扣件松开长度以及曲线半径共同影响,与温度不相关;(3)钢轨应力状态与扣件松开长度、曲线半径近似呈反比例函数负相关;(4)施工轨温低于锁定轨温时钢轨受力最大,为保证可一次性更换2~3块轨道板,建议直线地段最小扣件松开长度100 m、半径大于5500 m曲线超高地段最小扣件松开长度110 m;(5)本研究结果可为进一步优化高速铁路线路运维技术和提升基础设施装备技术水平提供参考依据。Research purposes:In recent years,the demand for ballasted track slab overhaul has increased,and the replacement of ballasted track slab on business lines is becoming a common problem on the whole railway,therefore there is a need to seek reasonable parameters of the line toggle for slab replacement to improve the efficiency of concrete slab replacement.To explore the optimization of reasonable parameters for rail shifting and further improve the efficiency of line maintenance,taking the renovation of existing operation lines for track shifting and slab replacement as the research object,by establishing a FEM,the effects of line curve super elevation,equipment layout spacing,fastener release length,and temperature on track shifting operation under track shifting states were studied.Research conclusions:(1)The conditions in curve superelevation sections were more stringent,before track shifting,analyzing and adjusting the equipment layout spacing to a reasonable spacing could greatly improve the safety of the operation.(2)The pull-up force is affected by the height of the tooling rail,the length of the fastener release,and the radius of the curve,and is not related to temperature.(3)The stress state is approximately inversely proportional to the length of the fastener release and the curve radius.(4)The temperature of the construction track is lower than the temperature of the locked track,which is the most unfavorable stress situation for the rail,to ensure that 2~3 track slabs can be replaced at once,it is recommended that the minimum fastener release length be 100 m,and for the curve,superelevation section with a radius greater than 5500 m be 110 m.(5)The research results can provide reference for further optimizing high-speed railway line maintenance and improving infrastructure equipment technology level.

关 键 词:高速铁路 线路拨道 换板 运输维修 运营线路 

分 类 号:U213.9[交通运输工程—道路与铁道工程]

 