摘 要:董奉山隧道地质情况差,其中V级富水软弱围岩浅埋段施工安全风险高,辅洞采用三台阶预留核心土法开挖过程中出现围岩收敛、沉降等变形较大,掌子面溜塌、初支开裂等问题,无法有效确保隧道安全进尺;为确保施工安全,加强开挖过程中支护效果,减少围岩收敛变形,项目对三台阶预留核心土法进行优化,形成了三台阶预留核心土+临时仰拱法,并在董奉山隧道中应用,从而减少了隧道围岩拱顶沉降及周边收敛,提升了隧道开挖安全性。The geological conditions of the Dongfeng mountain tunnel are poor,and the construction safety risk of the shallow buried section of the V-grade watery and weak surrounding rock is high.During the excavation process of the auxiliary tunnel using the three step reserved core soil method,there were significant deformations such as convergence and settlement of the surrounding rock,as well as problems such as collapse of the tunnel face and cracking of the initial support,which cannot effectively ensure the safe advance of the tunnel.To ensure construction safety,strengthen the support effect during excavation,and reduce the convergence deformation of surrounding rock,the project optimized the three step reserved core soil method,forming the three step reserved core soil+temporary inverted arch method,and applied it in the Dongfeng mountain tunnel,thereby reducing the settlement of the tunnel surrounding rock arch top and the convergence of the surrounding rock,and improving the safety of tunnel excavation.
分 类 号:U455.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28