检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:山世成 唐海达 王玉洁 SHAN Shicheng;TANG Haida;WANG Yujie(Yuanquan Engineering Construction Supervision Co.,LTD.,of Rizhao Municipality,Rizhao,Shandong 276800,China)
机构地区:[1]日照市源泉工程建设监理有限公司,山东日照276800
出 处:《山东水利》2024年第12期37-39,共3页Shandong Water Resources
摘 要:为解决坝基渗漏问题,日照市付疃拦河闸除险加固工程采用双轮铣深层搅拌水泥土连续墙CSM工法施工,使水泥浆与底部风化岩充分拌合,有效形成截渗止水效果,通过CSM工法运用,有效解决了坝基渗漏问题,提升了橡胶坝的蓄水能力。In order to solve the problem of dam foundation leakage,the CSM construction method of double-wheel milling deep mixing cement soil continuous wall was adopted in the risk alleviation and reinforcement project in Futuan Gate in Rizhao,to fully mix the cement slurry and the weathering rock at the bottom,targeting to form the effect of seepage and water sealing effectively.Through the application of CSM construction method,the dam foundation leakage problem is effectively solved,and the water storage capacity of rubber dam is improved.
分 类 号:TU755.8[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117