作 者:丰慧 聂蕊琪 张可[2] FENG Hui;NIE Ruiqi;ZHANG Ke(School of Economics and Management,Nanjing Institute of Technology,Nanjing 211167,China;Business School,Hohai University,Nanjing 211100,China)
机构地区:[1]南京工程学院经济与管理学院,江苏南京211167 [2]河海大学商学院,江苏南京211100
出 处:《运筹与管理》2024年第11期30-36,共7页Operations Research and Management Science
基 金:国家社会科学基金资助项目(17BGL156);河海大学中央高校基本科研业务费专项资金项目(B220207039);住房和城乡建设部2018年科学技术项目计划(2018-K8-023)。
摘 要:合同项目延误将有可能给项目群中其它合同项目和NCRPE削峰所带来不利影响,它不但是一种非线性关系,而且在多利益主体环境下它具有连锁和放大效应。为了降低这种不利影响程度,针对现有延误和索赔规则只适用单项目的不足,如何通过有效监控关键链项目群的缓冲,提升合同项目和项目群的按时完工率是降低业主风险的关键。首先,分析合同项目延误给项目群带来的不利影响,剖析延误费用非线性优化原理。其次,引入关键链,研究并构建延误费用非线性优化模型。最后,开展项目群Q的案例分析。研究表明,本文构建的模型能够在提高资源均衡程度的同时,实现工期和费用的双优化,有助于管理者根据工期偏好程度,在费用、工期、资源均衡及最大需求强度之间作出权衡。Programs are the basic form of achieving multi-level strategic goals and also the basic unit for implementing major projects.In the process of program implementation,program delay management plays an important role in the overall implementation of the program.Compared with a single project,contracted project delays under multiple stakeholders bring two more significant adverse effects to the program:firstly,there are more factors that affect the on-time completion rate of contracted projects in the program,and the chain reaction is more significant,which brings adverse effects to other contracted projects,making the control of other contracted projects more complex and difficult;secondly,according to the current rules of delay compensation and claim contract terms,most of the risks brought by contracted project delays to the program are borne by the employer.This means that the adverse effects of contracted project delays on other contracted projects and peak shaving are not only nonlinear,but also have a chain and amplification effect in a multi stakeholder environment.Therefore,starting from the perspective of stakeholders,how to balance the needs of the employers while reducing the impact of contracted project delays on the entire program,thereby reducing the risks and responsibilities of the employers,is a problem that needs to be addressed.This article,in accordance with the current rules on compensation and claims for delay damages(such as FIDIC),reveals the mechanism of cost increase and changes caused by contracted project delays to employers,and introduces the critical chain method to construct a nonlinear optimization model for program delay costs based on the critical chain.This enriches the theory of program cost optimization,and by effectively monitoring the buffer of the critical chain program,the balance of NCRPE,start rate of contracted projects,and on-time completion rate of milestone schedules and program schedules can be improved,to reduce the negative impact of NCRPE imbalance and contracted p
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222