检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:聂旸 Nie Yang(China Building Materials(Henan)Survey and Design Co.Ltd.,Xinyang,Henan 464000)
机构地区:[1]中建材(河南)勘测设计有限公司,河南信阳464000
出 处:《江西建材》2024年第9期197-199,共3页
摘 要:为了保证深厚软土地区高速铁路桥梁桩基础的施工质量,文中以京沪高铁河南至北京段为例,建立沉降变形监测网,利用自动监测技术分析高速铁路桥梁桩基础的沉降时程响应。结果表明,随着开挖进度的增加,墩桩底土层压缩量先快速降低后缓慢降低;随着桩底深度的增加,桩底压缩量厚度越来越大;桩外缘面积越大,压缩层厚度越小。其中,DK124工点及DK240处桥梁桩基础基层压缩距桩底位置分别为9.5、12.5 mm,对应的相邻测点每延米压缩量分别为0.09、0.08 mm,满足规范要求。In order to ensure the construction quality of high-speed railway bridge pile foundation in deep soft soil area, taking Henan to Beijing section of Beijing-Shanghai high-speed railway as an example, a settlement deformation monitoring network was established to analyze the settlement time-history response of high-speed railway bridge pile foundation by using automatic monitoring technology. The results show that with the increase of excavation progress, the compression of soil layer at the base of pier pile decreases rapidly at first and then slowly. With the increase of pile bottom depth, the thickness of pile bottom compression becomes larger and larger. The larger the area of the outer edge of the pile, the smaller the thickness of the compressed layer. Among them, the compression distance between the base of the bridge pile foundation at DK124 working point and DK240 is 9.5 mm and 12.5 mm respectively, and the compression amount per meter of the corresponding adjacent measuring point is 0.09 mm and 0.08 mm respectively, which meets the requirements of the specification.
分 类 号:U238[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222