满水暗涵续建工程临时封堵技术研究  

Research on Temporary Sealing Technology for Continued Construction of Full Water Culvert Project

在线阅读下载全文

作  者:许兵 XU Bing(China Railway 12th Bureau Group No.2 Engineering Co.,Ltd.,Taiyuan 030032,China)

机构地区:[1]中铁十二局集团第二工程有限公司,太原030032

出  处:《中国厨卫》2025年第1期205-207,共3页Chinese Kitchen & Bathroom

摘  要:为解决满水暗涵续建工程封堵难度大的问题,研究了一种适用三级封堵、以疏代堵临时混凝土封堵技术。文章重点分析了该技术关键控制要点及质量保证措施,并对该技术现场实施效果、社会环保效益、经济效益方面进行了分析。研究结果发现,满水暗涵临时封堵技术操作简单、成本较低、表现出了良好的经济和社会效益,值得同类型工程推广应用。In order to solve the problem of difficult sealing in the continued construction of full water culverts,a temporary concrete sealing technology suitable for three-level sealing and using drainage instead of sealing was studied.The article focuses on analyzing the key control points and quality assurance measures of the technology,and analyzes the on-site implementation effect,economic benefits,and social environmental benefits of the technology.The research results found that the temporary sealing technology for full water culverts is simple to operate,cost-effective,and has shown good economic and social benefits,which is worthy of promotion and application in similar projects.

关 键 词:满水暗涵 三级封堵 以疏代堵 钢筋网槽 潜水泵 

分 类 号:TV554.9[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象