蛇形切割工艺在煤巷快速掘进中的应用分析  

Analysis on the Application of Serpentine Cutting Technology in Rapid Excavation of Coal Roadway

作  者:闫琛 YAN Chen(Jinneng Holding Coal Industry Group Zheneng Majialiang Coal Industry Co.,Ltd.,Shuozhou 036000,Shanxi,China)

机构地区:[1]晋能控股煤业集团浙能麻家梁煤业有限公司,山西朔州036000

出  处:《凿岩机械气动工具》2025年第1期80-82,共3页Rock Drilling Machinery & Pneumatic Tools

摘  要:文章通过分析某煤矿综采工作面的工程概况,确定了顶板安全跨度和巷道受力情况。采用Midas GTS NX有限元软件模拟不同切割工艺路径下的巷道应力和变形情况。结果表明,自下而上的蛇形切割工艺能有效减小巷道变形量和应力集中,增强巷道的稳定性。在实际应用中,引入蛇形切割工艺和机载临时支护方案后,掘进进度从71 m/月提升至89 m/月,巷道稳定系数从1.5增加至1.9,显著提升了掘进效率和安全性。By analyzing the engineering situation of fully mechanized mining face in a coal mine,the roof safety span and roadway stress are determined.Midas GTS NX finite element software is used to simulate the stress and deformation of roadway under different cutting technical paths.The results show that the bottom-up serpentine cutting technology can effectively reduce the deformation and stress concentration of the roadway and enhance its stability.In practical application,after the introduction of serpentine cutting technology and machine-mounted temporary support scheme,the excavation progress is increased from 71 m/month to 89 m/month,and the roadway stability coefficient is increased from 1.5 to 1.9,which significantly improves the excavation efficiency and safety.

关 键 词:蛇形切割工艺 巷道稳定性 有限元模拟 掘进效率 

分 类 号:P633.3[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象