斜拉桥前支点挂篮行走体系转换与移位下放施工技术研究  

Research on the Walking System Transition and Displacement Lowering Construction Technology for Front Support Hanging Basket of Cable-stayed Bridge

在线阅读下载全文

作  者:武强 刘洋 董军[2] 杨新浩 Wu Qiang;Liu Yang;Dong Jun;Yang Xinhao(CCCC First Highway Xiamen Engineering Co.,Ltd.,Xiamen 361021,China;Beijing Engineering Research Center of Engineering Structures and New Materials,Beijing University of Civil Engineering and Architecture,Beijing 100044,China)

机构地区:[1]中交一公局厦门工程有限公司,福建厦门361021 [2]北京建筑大学工程结构与新材料北京市高等学校工程研究中心,北京100044

出  处:《市政技术》2025年第1期76-83,92,共9页Journal of Municipal Technology

基  金:北京市自然科学基金项目(8202012);河南省交通运输厅科技计划项目(201602)。

摘  要:前支点挂篮技术因具有稳定性好、适应性强且安全性高等优点,被广泛应用于大跨度混凝土斜拉桥的主梁悬臂浇筑施工中。然而,当桥梁中跨合龙完成后,若挂篮体量较大且桥下存在建筑物或湍急江河时,直接下放挂篮的难度和风险会显著增加。因此为解决这一技术难题,依托重庆市草街嘉陵江特大斜拉桥项目,提出并应用了一种前支点挂篮行走体系转换与移位下放施工技术,并通过对现有挂篮行走转换装置技术的借鉴与创新,研发出了一种前支点挂篮行走体系转换装置,然后对该装置的设计构造、结构验算、下放方案以及主要工艺流程进行了介绍。工程实践表明,该施工技术能够将前支点挂篮高效平稳地移动至指定的索塔根部进行下放和拆除,显著降低了操作风险,提升了施工安全性和效率,可为类似工程提供参考。The front support hanging basket technique is widely used in the cantilever casting of main girders of large-span concrete cable-stayed bridge because of its advantages of stability,strong adaptability and high safety.However,once the midspan closure of the bridge is completed,if the hanging basket is larger and there are buildings or fast-flowing rivers beneath it,the difficulty and risk of directly lowering the hanging basket increase greatly.In order to solve the problem,a walking system transition and displacement lowering construction technique for the front support hanging basket was proposed and applied in Jialing River Grand Cable-Stayed Bridge project of Caojie,Chongqing.By drawing on and innovating existing technologies,a new front support hanging basket walking system transition apparatus was developed.And the design and structure,structural verification,the lowering plan,and main process flow of this apparatus were introduced.Engineering practice has demonstrated that this construction technology can efficiently and smoothly move the front support hanging basket to the designated cable tower base for lowering and dismantling,significantly reducing operational risks,and enhancing construction safety and efficiency,which can provide reference for similar engineering projects.

关 键 词:前支点挂篮 转换装置 设计构造 结构验算 下放方案 工艺流程 

分 类 号:U445.4[建筑科学—桥梁与隧道工程] U448.27[交通运输工程—道路与铁道工程]

 