检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:季乐乐[1] 王璐 刘倩 赵东 吴宏扬 Ji Lele;Wang Lu;Liu Qian;Zhao Dong;Wu Hongyang(Beijing Metallurgical Equipment Research Design Institute Co.,Ltd.,Beijing 100029)
机构地区:[1]北京中冶设备研究设计总院有限公司,北京100029
出 处:《冶金设备》2024年第S2期70-72,10,共4页Metallurgical Equipment
摘 要:中小型高炉产能置换和扩容重组是响应国家钢铁行业发展战略的重要方向,本文主要介绍某高炉从530m^(3)扩容到800m^(3)后上料和炉顶系统的升级改造。通过高炉上料作业率计算分析,对扩容后的高炉进行上料系统、炉顶设备改造设计,并成功投产应用,投产后高炉运行指标良好,这对于同级别高炉扩容改造有重要的指导和借鉴意义。Long life,energy saving,environmental protection and large scale are the development trends of blast furnace.The capacity replacement and expansion restructuring of small and medium⁃sized blast furnaces are important directions in response to the development strategy of the national steel industry.This article mainly introduces the upgrading and transformation of the feeding and top system of blast furnace after expanding from 530m^(3) to 800m^(3).By calculating and analyzing the loading operation rate of the blast furnace,the loading system and top equipment of the expanded blast furnace were redesigned and successfully put into operation.The operating indicators of the blast furnace were good after operation,which has important guidance and reference significance for the expansion and transformation of blast furnaces of the same level.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.141.43.16