检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈佳美 Chen Jia-mei(China Railway 12th Bureau Group South China Engineering Co.,Ltd.,Zhongshan 528451,Guangdong Province,China)
机构地区:[1]中铁十二局集团华南工程有限公司,广东中山528451
出 处:《建筑与装饰》2025年第1期181-183,共3页Construction & Decoration
摘 要:PHC预应力管桩施工技术当前在高层建筑中被使用,因该技术具有较好的承载力,可以满足高层建筑施工需求。本文对PHC预应力管桩施工技术在实际工程施工过程中存在的问题进行分析,并提出几点要求。需要做好施工前准备工作、对管桩质量进行检测、落实探孔工作等,并结合实际工程实验,结合施工要点、证明要点可以为实际施工提供帮助,便于施工人员对出现问题进行快速分析,从而提高施工效率,缩短高层建筑项目施工时间。PHC(Prestressed High-Strength Concrete)pipe pile construction technology is currently used in high-rise buildings due to its good load-bearing capacity,which can meet the construction requirements of high-rise buildings.This paper analyzes the problems existing in the actual engineering construction process of PHC prestressed pipe piles and proposes several requirements.It is necessary to prepare well before construction,inspect the quality of pipe piles,and implement exploration hole work,etc.Combined with practical engineering experiments,this paper discusses the construction points and proof points that can help actual construction,facilitate construction personnel to quickly analyze problems,thereby improving construction efficiency and shortening the construction time of high-rise building projects.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.210.110