检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:於豪 YU Hao(Fujian Fuqing Nuclear Power Co.,Ltd.,Fuqing,Fujian Prov.350318,China)
出 处:《中国核电》2024年第5期614-617,共4页China Nuclear Power
摘 要:本论文针对汛期全厂非放射性含油排水系统油水储存池液位快速上涨,导致厂房和设备被淹的异常运行状态,通过深入分析系统设计、针对主要问题点进行分析论证,结合论证结果进行现场实际验证,整治后非放射性含油排水系统运行可靠性得到大幅提升,能有效避免再次出现厂房及系统设备被淹事件,从而确保全厂流出物排放满足相关法规监管要求,相关分析论证经验及优化建议对同行处理类似问题有一定的参考借鉴意义。This paper aims at the abnormal operation condition of the plant and equipment flooded due to the rapid rise of the liquid level in the oil-water storage pool of the non radioactive oily drainage system of the whole plant in the flood season Through in-depth analysis of the system design,analysis and demonstration of the main problem points,combined with the demonstration results for on-site actual verification,the operation reliability of the non radioactive oily drainage system has been greatly improved,which can effectively avoid the flooding of the plant and system equipment again,so as to ensure that the effluent discharge of the whole plant meets the regulatory requirements of relevant laws and regulations.Relevant analysis and demonstration experience and optimization suggestions have certain reference significance for peers to deal with similar problems.
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15