检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒋毅 李彬 黄驿槿 王戈兵 虞承先 方金 郑锐 汤衡 JIANG Yi;LI Bin;HUANG Yijin;WANG Gebing;YU Chengxian;FANG Jin;ZHENG Rui;TANG Heng(China Overseas Development Group Co.,Ltd.,Shenzhen 518000,Guangdong,China;Shenzhen Branch of Arup International Consultants(Shanghai)Co.,Ltd.,Shenzhen 518000,Guangdong,China;Hong Kong Huayi Design Consultants(Shen Zhen)Ltd.,Shenzhen 518000,Guangdong,China)
机构地区:[1]中海企业发展集团有限公司,广东深圳518000 [2]奥雅纳工程咨询(上海)有限公司深圳分公司,广东深圳518000 [3]香港华艺设计顾问(深圳)有限公司,广东深圳518000
出 处:《建筑科学》2024年第12期213-219,227,共8页Building Science
基 金:中海集团科技研发课题“双碳战略下低碳办公建筑关键技术研究及产业化”(COHL-2021-Z-4)。
摘 要:经调研,多数办公类项目均采用传统的热湿耦合降温除湿方式处理室内负荷,该方式需冷源常年提供7℃左右冷冻水,主机能效相对较低且室内空调末端处理空气过程中产生的凝结水易滋生细菌,从节能低碳及健康角度考虑均有必要研究更好的技术方案。对比了采用传统空调与干式风盘、主动式冷梁、冷辐射吊顶及全空气变风量复合干式风盘系统的热湿处理过程及优缺点,结合某办公项目实例进行了具体的温湿度独立处理方案分析计算,系统能效可达到约6.2,优化冷源方案利用高温冷机负担室内负荷并预冷新风,其承担负荷比例高达73.5%。A survey of existing projects showed that most office projects adopt the traditional cooling and dehumidification method of heat and humidity coupling to handle indoor cooling loads,which requires a cold source to provide chilled water at about 7℃all year round.Theenergy efficiency of thehost isrelatively lowand condensate water is easy to breed bacteria in the process of air treatment at the terminal units of the air-conditioning system.Therefore,from the perspective of energy saving,carbon reduction and health,it is necessary to find a better technical solution.This paper compared the heat and humidity treatment processes of different systems and their respective advantages and disadvantages,including the use of traditional air conditioning with dry fan coil unit system,the active cold beam system,the cold radiation ceiling system and all-air variable air volume composite dry fan coil system.In combination with the case of an office project,this paper analyzed and calculated the specific independent temperature and humidity control scheme.The energy efficiency of the system can reach approximately 6.2.The optimized cold source scheme utilizes a high temperature chiller to bear indoor loads and precool fresh air,with a load bearing ratio of up to 73.5%.
分 类 号:TU831[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222