检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李欣怡 徐云泉 LI Xinyi;XU Yunquan(Power China Kunming Engineerig Co.,Ltd.,Kunming,Yunnan Province,650000 China)
机构地区:[1]中国电建集团昆明勘测设计研究院有限公司,云南昆明650000
出 处:《科技资讯》2025年第1期79-83,共5页Science & Technology Information
摘 要:某水电站采用河床式开发,挡水建筑物为闸坝,闸墩高为60.5m,厚度仅为5m。泄洪闸闸墩顶部布置启闭机排架,启闭机高达26.5m。排架属于高耸结构,在遭遇地震时,启闭机排架将出现较大的地震响应,可能造成结构损害,从而影响工程安全。为研究方案是否可行,对泄洪闸闸墩、闸顶高排架进行三维有限元静、动力分析,以为类似结构设计提供参考。A certain hydropower station adopts riverbed development,with a water retaining structure of a gate dam,a gate pier height of 60.5 m,and a thickness of only 5 m.The top of the flood discharge gate pier is equipped with a hoist rack,with a height of up to 26.5 m.The rack belongs to a high-rise structure,and in the event of an earthquake,the rack will experience significant seismic response,which may cause structural damage and affect engineering safety.To investigate the feasibility of the proposed plan,a three-dimensional finite element static and dynamic analysis was conducted on the spillway gate pier and gate top height bracket,providing reference for similar structural designs.
分 类 号:TV651.3[水利工程—水利水电工程] TV311
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.48.161