引洮二期庄浪应急供水工程管道施工导流方案  

Diversion Plan for Pipeline Construction of Yintao Phase II Zhuanglang Emergency Water Supply Project

作  者:包政秀 BAO Zhengxiu(Gansu Hydraulic Engineering Geological Construction Co.,LTD.,Lanzhou 730000,China)

机构地区:[1]甘肃水利工程地质建设有限责任公司,甘肃兰州730000

出  处:《云南水力发电》2025年第1期78-81,共4页Yunnan Water Power

摘  要:为确保施工安全,应考虑施工期洪水对镇、支墩的浇筑以及压力管道的安装的影响。文章从导流标准、导流方式、导流建筑物设计等方面着重说明了施工导流方案的设计、导流建筑物的施工以及施工期防洪与基坑排水等方案,从而保障工程顺利、安全施工。To ensure construction safety,the impact of floods during the construction period on the pouring of towns and piers,as well as the installation of pressure pipelines,should be considered.The article focuses on the design of construction diversion schemes,the construction of diversion structures,as well as flood control and foundation pit drainage schemes during the construction period,from the aspects of diversion standards,diversion methods,and diversion structure design,in order to ensure the smooth and safe construction of the project.

关 键 词:引洮二期 应急供水 施工导流 导流标准 围堰 

分 类 号:TV551[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象