作 者:吴都督[1] WU Dudu(POWERCHINA SINOHYDRO ENGINEERING BUREAU 8 CO.,LTD.,Changsha 410004,China)
机构地区:[1]中国水利水电第八工程局有限公司,湖南长沙410004
出 处:《云南水力发电》2025年第1期87-90,共4页Yunnan Water Power
摘 要:大华桥水电站在坝顶结构设计过程中,改变传统的设计与施工思路,结合城市园林景观设计理念,对大坝坝顶防浪墙、照明、排水、配电房、铺装层等结构进行了创新设计,在设计上进行二次深化设计,在施工上进行小改小革,通过设计与施工的完美结合,不仅有效改善了坝顶排水、照明系统,解决了坝顶空间狭窄配电房无法布置的技术难题,还将坝顶打造成了一道靓丽的风景线。In the design process of the dam crest structure of Dahuaqiao Hydropower Station,traditional design and construction ideas were changed,combined with urban landscape design concepts,and innovative designs were made for the dam crest wave wall,lighting,drainage,distribution room,pavement layer and other structures.Secondary deepening design was carried out in the design,and minor changes were made in the construction.Through the perfect combination of design and construction,not only did the dam crest drainage and lighting system be effectively improved,but the technical difficulties of the narrow space of the dam crest that cannot be arranged for the distribution room were also solved.The dam crest was also created into a beautiful scenic line.
分 类 号:TV222[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175