分体装配式大坝防浪墙施工工艺技术  

Construction Technology of Split Assembly Dam Wave Wall

在线阅读下载全文

作  者:尤悦 YOU Yue(POWERCHINA SINOHYDRO ENGINEERING BUREAU 15 CO.,LTD.,Xi'an 710086,China)

机构地区:[1]中国水电建设集团十五工程局有限公司,陕西西安710086

出  处:《云南水力发电》2025年第1期94-97,103,共5页Yunnan Water Power

摘  要:防浪墙应用于大坝及河道顶部上,在防浪、防洪、阻水方面意义重大。随着水库除险加固工程规模的不断扩大,防浪墙在水库大坝等水利工程建设中得到广泛的应用。依托老挝南欧江七级水电站项目,对传统防浪墙施工技术进行优化,在保证防浪墙功能、断面面积、强度、抗滑稳定及抗倾覆满足设计要求前提下,采用现浇(底座)+预制(墙体)+现浇(三角部分)的方式进行防浪墙施工,该分体装配式防浪墙施工方法简单,对坝面防护要求低,施工安全可控,可在各类大坝防浪墙及河道防浪墙施工中进行推广应用。The application of wave walls on dams and river tops is of great significance in wave prevention,flood control,and water blocking.With the continuous expansion of the scale of reservoir reinforcement projects,wave walls have been widely used in the construction of water conservancy projects such as reservoir dams.The article focuses on optimizing the traditional wave wall construction technology based on the Nan'ou River seven level hydropower station project in Laos.On the premise of ensuring that the function,cross-sectional area,strength,anti sliding stability,and anti overturning of the wave wall meet the design requirements,the construction of the wave wall is carried out by using the method of cast-in-place(base)+prefabricated(wall)+cast-in-place(triangular part).The construction method of the split assembly wave wall is simple,with low requirements for dam surface protection and controllable construction safety.It can be widely applied in the construction of various dam wave walls and river wave walls.

关 键 词:分体装配式 大坝 防浪墙 

分 类 号:TV698.23[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象