检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何佳 HE Jia(Datang Yunnan Power Generation Co.,Ltd.,Kunming 650000,China)
出 处:《云南水力发电》2025年第1期135-138,共4页Yunnan Water Power
摘 要:水轮机转轮泵板发生裂纹需对其进行更换改造时,是否需要进行静平衡试验,观点不一。文章分析了泵板改造前静不平衡的影响因素、泵板改造前后的区别,结合实例从泵板质量偏差、泵板与转轮同心度偏差等方面计算了泵板改造后对静不平衡的影响因素以及占比情况,通过定量分析及实际案例实施,找到了泵板改造静不平衡分析的方法、步骤、适用条件,解决了泵板更换改造对静平衡影响大小分析不充分的问题。对后续相关改造分析具有参考价值。When cracks occur on the pump plate of the turbine runner and it needs to be replaced,there are different views on whether static balance test is required.This paper analyzes the influencing factors of static imbalance before and after the pump plate transformation,and the differences between the pump plate transformation and the pump plate transformation.Combined with examples,the paper calculates the influencing factors and the proportion of static imbalance after the pump plate transformation from the aspects of pump plate quality deviation,pump plate and runner concentricity deviation.Through quantitative analysis and actual case implementation,the paper finds out the method,steps and applicable conditions of static imbalance analysis for the pump plate transformation,The problem of insufficient analysis of the influence of pump plate replacement and reconstruction on static balance is solved.It has a good reference significance for the subsequent relevant transformation analysis.
分 类 号:TV734.1[水利工程—水利水电工程] TK730.323[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222