检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:金俊超 景来红 宋志宇 苏凯[3] 白正雄 JIN Jun-chao;JING Lai-hong;SONG Zhi-yu;SU Kai;BAI Zheng-xiong(Yellow River Engineering Consulting Co.Ltd.,Zhengzhou 450003,China;Key Laboratory of Water Management and Water Security for Yellow River Basin,Ministry of Water Resources(Under Construction),Zhengzhou 450003,China;State Key Laboratory of Water Resources Engineering and Management,Wuhan University,Wuhan 430072,China)
机构地区:[1]黄河勘测规划设计研究院有限公司,河南郑州450003 [2]水利部黄河流域水治理与水安全重点实验室(筹),河南郑州450003 [3]武汉大学水资源工程与调度全国重点实验室,湖北武汉430072
出 处:《水电能源科学》2025年第1期150-154,51,共6页Water Resources and Power
基 金:中国博士后科学基金项目(2022M721299);河南省重点研发与推广专项(232102320339)
摘 要:针对混凝土衬砌在高内水压下开裂渗漏问题,将隧洞概化为透水衬砌—灌浆圈—围岩厚壁圆筒模型,通过理论推导建立了考虑外水压力的水压致裂解析方法,实现了施作衬砌—充水加压—衬砌开裂全过程模拟。研究发现衬砌施作时承受外水压力作用,渗流为向洞内溢出;内压大于外压后,钢筋应力由压转为拉;衬砌开裂后,钢筋应力急剧增大—迅速下降—缓慢增加。开裂前衬砌与围岩处于相互挤压的状态,粘结力不影响衬彻结构受力;衬彻与围岩脱离后,衬砌与围岩单独承载,其变形和受力与粘结力无关。透水衬砌—灌浆圈—围岩模型与透水衬砌—围岩模型结果规律一致,但考虑灌浆后渗漏量显著下降。Aiming at the problem of cracking and leakage of concrete lining under high internal water pressure,the tunnel was generalized a permeable lining-grouting ring-surrounding rock thick-walled cylinder model,and an analytical method of hydraulic fracturing was derivated considering external water pressure.The whole process simulation of lining-water filling pressure-lining cracking was realized.It is found that the lining is subjected to external water pressure during construction,and the seepage is overflowing into the tunnel.When the internal pressure is greater than the external pres-sure,the stress of the steel bar changes from pressure to tension.After the lining cracks,the stress of the steel bar in-creases sharply-declines rapidly-increases slowly.Before cracking,the lining and surrounding rock are in a state of mutual extrusion,and the bonding force does not affect the force of the lining structure.After the lining is separated from the surrounding rock,the lining and the surrounding rock are loaded separately,and the deformation and stress are independ-ent of the cohesive force.The results of the permeable lining-grouting ring-surrounding rock model and the permeable lin-ing-surrounding rock model are consistent,but the leakage after grouting is significantly reduced.
关 键 词:高压隧洞 透水衬砌 水压致裂 内水外渗 联合承载
分 类 号:TV672.1[水利工程—水利水电工程] TU45[建筑科学—岩土工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.41.223