检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈虎 郭园 祝雪萍[1] 霍云超 刘晓东[2] 高学睿[3] 牛鑫 CHEN Hu;GUO Yuan;ZHU Xue-ping;HUO Yun-chao;LIU Xiao-dong;GAO Xue-rui;NIU Xin(College of Water Resources Science and Engineering,Taiyuan University of Technology,Taiyuan 030024,China;PowerChina Northwest Engineering Corporation Limited,Xi'an 710065,China;Institute of Soil and Water Conservation,Northwest A&F University,Yangling 712100,China)
机构地区:[1]太原理工大学水利科学与工程学院,山西太原030024 [2]中国电建集团西北勘测设计研究院有限公司,陕西西安710065 [3]西北农林科技大学水土保持研究所,陕西杨凌712100
出 处:《水电能源科学》2025年第1期197-201,共5页Water Resources and Power
基 金:国家自然科学基金项目(52379018);山西省科技创新人才团队专项(202204051002027)。
摘 要:以安徽省董铺—大房郢水库为例,以水库缺水率最小和补水量最少为最优准则,考虑董铺—大房郢水库水源连通工程水量补偿式调节和接受上游淠河灌区水库群补水的特殊机制,构建董铺—大房郢水库双目标优化供水调度模型,并采用基于混合交叉算子改进的NSGA-Ⅱ算法求解模型。结果表明,算数交叉算子(ACO)混合模拟二进制交叉算子(SBX)的收敛时间较单一SBX算子缩短11.48%,较单一ACO算子缩短2.58%;其中混合算子SBX-ACO求得的解集质量更好,对应评价指标世代距离(GD)值(8.13×10^(-4))、反世代距离(IGD)值(3.1×10^(-4))为所有计算方案中最小。优化调度模型求解的供水方案中两库补水量比不优化条件下的补水量减少11.5%。在计算效率及解集质量上综合验证了所提出的改进算法的有效性,同时为区域水资源优化调度提供科学依据。This paper takes the Dongpu-Dafangying reservoir in Anhui Province as the research object.Optimal crite-rias are the minimum water shortage rate and the minimum water replenishment of the reservoir.The dual-objective opti-mal water supply scheduling model of the Dongpu-Dafangying Reservoir is established considering the compensatory ad-justment of the water volume of the Dongpu-Dafangying Reservoir water source connection project and the special mecha-nism of accepting the water supply of the reservoir group in the upstream Pihe irrigation area.The improved NSGA-Ⅱalgorithm based on the hybrid cross operator is used to solve the model.The results show that the convergence time of a-rithmetic cross operators(ACO)mixed simulated binary crossover(SBX)is shortened by 11.48%compared with the single SBX operator,and 2.58% shorter than that of the single ACO operator.Among them,the solution set obtained by the hybrid operator SBX-ACO is of better quality.Its corresponding evaluation index generational distance(GD)value(8.13×10^(-4))and inverted generational distance(IGD)value(3.1×10^(-4))are the lowest among all calculation schemes.In the water supply scheme solved by the optimal scheduling model,the water replenishment of the two reservoirs is re-duced by 11.5%compared with that of the non-optimal condition.This paper comprehensively verifies the effectiveness of the improved algorithm in terms of computational efficiency and solution set quality.It provides a scientific basis for the optimal scheduling of regional water resources.
关 键 词:改进NSGA-Ⅱ 混合交叉算子 优化供水调度 IGD评价指标
分 类 号:TV697.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15