CPR1000型核电机组大修集体剂量控制  

Control experience on collective dose during outage of CPR1000 unit

在线阅读下载全文

作  者:周玉清 牛晓庆 ZHOU Yuqing;NIU Xiaoqing(CGN Fangchenggang Nuclear Power Co.Ltd.,Guangxi Fangchenggang 538001;China Nuclear Environmental Ptotection Industry Co.Ltd.,Jiangsu Lianyungang 222042)

机构地区:[1]广西防城港核电有限公司,广西防城港538001 [2]中核环保产业有限公司,江苏连云港222042

出  处:《辐射防护通讯》2024年第6期28-33,共6页Radiation Protection Bulletin

摘  要:核电机组大修集体剂量,主要受机组辐射水平和检修总工时影响。本文介绍了核电机组大修集体剂量的控制方法,从完善辐射防护组织、集体剂量目标分解、热点冲洗、创新检修工具、创新检修工艺、高辐射区域管控等方面总结了某核电厂2台CPR1000机组共10次大修集体剂量的控制经验。This article analyzes the two main factors affecting collective dose during outage of nuclear power units-namely the reactor unit radiation levels and the total maintenance working hours-and their control meth-ods.This article summarizes the experience gained from controlling collective dose during ten outages of two CPR1000 units at a particular nuclear power plant.Which includes enhancing radiation protection organiza-tions,allocating collective dose targets,conducting hot spot flushing,developing innovative maintenance tools and techniques,improving maintenance processes,and managing high level radiation areas.These experi-ences have been validated through practical implementation and proven to be effective.

关 键 词:核电厂 集体剂量 CPR1000型核电机组 大修 

分 类 号:TL752[核科学技术—辐射防护及环境保护]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象