作 者:祁琪 李博迪 袁潇 洪志豪 赵刚 吴中俣 QI Qi;LI Bodi;YUAN Xiao;HONG Zhihao;ZHAO Gang;WU Zhongyu(China Construction Third Bureau Group Co.,Ltd.,Wuhan,Hubei430064,China)
出 处:《施工技术(中英文)》2025年第2期113-117,共5页Construction Technology
摘 要:为克服强台风地区超高层建筑建造难题,提高海南省超高层建筑顶模施工水平,在海南中心项目施工过程中,首次采用BIM+技术,从顶模设计到安装阶段进行全流程优化,改善轻量化支点顶模集成平台安装工艺,实现轻量化支点顶模集成平台在复杂工况下的快速安装。实践证明,该技术可有效降低顶模施工难度,显著提高安装安全性,缩短安装周期,提高工程质量。In order to overcome the construction problems of super high⁃rise buildings in strong typhoon areas and improve the construction level of top formwork of super high⁃rise buildings in Hainan Province,BIM+technology is adopted for the first time in the construction process of Hainan Center project.The whole process is optimized from the design stage to the installation stage of top formwork,and the installation process of lightweight fulcrum top formwork integrated platform is improved,so as to realize the rapid installation of lightweight fulcrum top formwork integrated platform under complex working conditions.Practice proves that this technology can effectively reduce the difficulty of top formwork construction,significantly improve the safety of installation,shorten the installation period,and improve the quality of project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.183