基于BIM技术的黄龙抽水蓄能电站机电管线综合安装优化方法研究  

Research on Optimization Method of Integrated Installation of Electromechanical Pipelines of Huanglong Pumped Storage Power Station Based on BIM Technology

作  者:戚海峰 QI Hai-feng(CNNC Xinhua Huanglong Pumped Storage Power Generation Co.Ltd.,Tianshui 741020,China)

机构地区:[1]中核新华黄龙抽水蓄能发电有限公司,甘肃天水741020

出  处:《工程建设与设计》2025年第2期77-79,共3页Construction & Design for Engineering

摘  要:针对黄龙抽水蓄能电站机电管线系统安装过程中存在的诸多挑战,提出了一种基于BIM技术的综合安装优化方法,解决了碰撞管线自动调整的问题,实现了机电管线系统的综合安装优化。Aiming at the many challenges in the installation of electromechanical pipeline system in Huanglong Pumped Storage Power Station,a comprehensive installation optimization method based on BIM technology is proposed to solve the problem of automatic adjustment of collision pipeline and realize the comprehensive installation optimization of electromechanical pipeline system.

关 键 词:BIM技术 抽水蓄能电站 机电管线 综合安装 

分 类 号:TP391.9[自动化与计算机技术—计算机应用技术] TV52[自动化与计算机技术—计算机科学与技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象