地铁车站轨排井基坑及结构施工分析  

CONSTRUCTION ANALYSIS OF FOUNDATION PIT AND STRUCTURE OF SUBWAY STATION TRACK PANEL WELL

在线阅读下载全文

作  者:朱金邦 Zhu Jin-bang

机构地区:[1]中铁第五勘察设计院集团有限公司,北京102627

出  处:《建筑技术开发》2025年第2期75-77,共3页Building Technology Development

摘  要:以长春市祝家屯站轨排井位置的主体基坑、框架结构为研究对象,对轨排井基坑的支护及使用阶段的结构框架进行探讨分析,通过结合理论计算、实际施工期间、完工后的监测数据综合分析,进而对轨排井围护、结构形式的选择,对轨排井位置的设计具有一定参考价值。Taking the main foundation pit and frame structure of the rail row well location of Zhujiatun Station in Changchun City as the research object,the structural framework of the support and use stage of the rail row well foundation pit was discussed and analyzed,and the comprehensive analysis of the monitoring data during the actual construction period and after completion was combined with the theoretical calculation,the actual construction period and the completion of the monitoring data,and then the selection of the rail row well enclosure and structural type was carried out.The design of the position of the rail row well has certain reference value.

关 键 词:轨排井 围护结构 结构框架 监控量测 

分 类 号:TU753[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象