检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑利辉 Zheng Li-hui
机构地区:[1]建研地基基础工程有限责任公司福建分公司,福建厦门361000
出 处:《建筑技术开发》2025年第2期134-136,共3页Building Technology Development
摘 要:软土地区厂房基础多采用预制桩、灌注桩,由于上部软弱土及施工质量存在缺陷,通常会造成厂区地坪凹陷、开裂等质量问题。通过对某大型厂房项目的不均匀沉降、底板脱空原因研究分析,采用桩筏互补加固技术,大幅度提高了深厚软土区地基承载力,有效减小沉降,同时解决了加固施工过程中涉及的厂区设备多作业空间小,施工不影响厂区正常生产等技术难题,该技术对于深厚软土区、狭小空间加固具有一定的参考意义。Prefabricated piles and cast-in-place piles are commonly used for factory foundations in soft soil areas.Due to the weak soil in the upper part and defects in construction quality,quality problems such as depression and cracking of the factory floor are often caused.This article analyzes the causes of uneven settlement and bottom plate void in a large factory project,and adopts pile raft complementary reinforcement technology to significantly improve the bearing capacity of the foundation in deep soft soil areas,effectively reduce settlement,and solve technical problems such as multiple equipment and small working space in the reinforcement construction process,which does not affect normal production in the factory area.This technology has certain reference significance for the reinforcement of deep soft soil areas and narrow spaces.
分 类 号:TU753.8[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7