检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁博轩 LIANG Boxuan(Guangdong Dike Construction Engineering Detection Co.,Ltd.)
机构地区:[1]广东迪科建设工程检测有限公司
出 处:《广东建材》2025年第2期77-80,共4页Guangdong Building Materials
摘 要:单桩竖向抗压静载试验是确定单桩竖向抗压承载力最为直观和可靠的方法,在桩基工程质量检测中占据着极为重要的地位。本文详细阐述了单桩竖向抗压静载试验从试验准备阶段、试验加载过程到试验数据处理与结果判定等各个环节的注意事项。通过对上述问题深入探讨,旨在提高单桩竖向抗压静载试验的准确性和可靠性,为桩基工程的设计、施工与验收提供更为科学合理的依据,保障整个建筑工程的质量与安全。The vertical compressive static load test of single pile is the most intuitive and reliable method for determining the vertical compressive bearing capacity of single pile,and it occupies an extremely important position in the quality inspection of pile foundation engineering.This paper elaborates in detail the precautions in each link of the vertical compressive static load test of single pile,from the test preparation stage,the test loading process to the test data processing and result determination.Through in-depth exploration of the above,the aim is to improve the accuracy and reliability of the vertical compressive static load test of single pile,provide a more scientific and reasonable basis for the design,construction and acceptance of pile foundation engineering,and ensure the quality and safety of the entire construction project.
关 键 词:单桩竖向抗压静载试验 试验准备 加载过程 数据处理 注意事项
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.224.37.168