110 kV电缆线路与通信光缆协同敷设技术  

Collaborative Laying Technology of 110 kV Cable Line and Communication Optical Cable

在线阅读下载全文

作  者:周晓能 宋海胜 ZHOU Xiaoneng;SONG Haisheng(Cable Gineering Branch of Zhejiang Dayou Industry Co.,Ltd.,Hangzhou 310000,China)

机构地区:[1]浙江大有实业有限公司电缆工程分公司,浙江杭州310000

出  处:《通信电源技术》2025年第2期49-51,共3页Telecom Power Technology

摘  要:为提高工程效率,结合110 kV电缆线路与通信光缆协同敷设的实际需求,探讨了协同敷设的基本原则,详细研究了敷设工艺自动化控制、共用管道敷设、架空光电复合缆、桥架敷设固定以及电磁兼容防护等多项关键技术,明确了各项技术在资源优化、施工效率提高及安全保障方面的作用,以期为智能电网和通信系统的高度融合奠定基础。In order to improve engineering efficiency and meet the practical needs of collaborative laying of 110 kV cable lines and communication optical cables,the basic principles of collaborative laying were discussed,and multiple key technologies such as laying process automation control,shared pipeline laying,overhead optoelectronic composite cables,bridge laying fixation,and electromagnetic capacitance protection were studied in detail.The roles of each technology in resource optimization,construction efficiency improvement,and safety guarantee were clarified,in order to lay the foundation for the high integration of smart grids and communication systems.

关 键 词:110 kV电缆线路 通信光缆 协同敷设 

分 类 号:TN914[电子电信—通信与信息系统]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象